The current development in the construction industry in Reno is exciting! A few examples of our past and recent projects would include areas in Lake Tahoe, Truckee, and downtown Reno. For more information on what’s new in downtown Reno go to www.downtownmakeover.com.
|
Reno Tahoe Airport
New $20 million Air Traffic Control Tower.
General Contractor: Devcon
Link Belt 8690 truck crane placing scaffolding.
Alimak 7100 construction elevator both fully operated and maintained. |
|
|
Peppermill $300 million Expansion
Two 550 Liebherr tower cranes building the new Tuscan Tower and
several smaller hydraulic cranes on the project along with one Alimak 7100 dual car construction elevator.
All provided on a fully operated and maintained basis. |
|
 |
 |
|
Reno Toyota
New $50 million auto dealership.
General Contractor: Q & D Construction Co.
Two 90 ton Link Belt cranes and one 60 ton Grove hydraulic crane.
All fully operated and maintained. |
|
 |
 |
|
NV Agriculture Building
General Contractor: West Coast Contractors
Steel fabricator and erector: Martin Iron Works
60 ton Grove erecting structural steel |
|
|
Ritz Carlton Hotel at Northstar
$220 million hotel complex.
75 ton and two 90 ton hydraulic cranes working on the foundation for the project.
Two Alimak 7100 construction elevators all fully operated and maintained. |
|
 |
 |
|
Arlington Towers
New boiler replacement at Arlington Towers in downtown Reno.
5175 Grove, a 175 ton hydraulic crane 161’ main boom and 92’ jib placing mechanical equipment. |
|
 |
 |
|
Donner Lake Tree Work
Contractor: Top Dog Timber
90 ton Link Belt hydraulic crane removing hazardous trees from the beach of the North Shore of Donner Lake. |
|
 |
|
Galena Creek Bridge Project
Contractor: CC Myers
200 ton Link Belt crawler and 90 ton Link Belt hydraulic truck crane placing column forms on the Steamboat Bridge portion of the project. |
|
 |
|
Legends at Sparks Marina
General Contractor: Q & D Construction Co.
Steel fabricator and erector: Viper Steel, Inc.
90 ton Link Belt rough terrain crane placing structural steel on one of the new retail buildings. |
|
 |
|
Montage Condominiums
General Contractor: UPA Group
Steel fabricator and erector: Reno Iron Works
LSI Crane provided several hydraulic cranes including a Grove 300 ton Luffer and a
Manitowoc 888 with Luffing boom to place over 400 balconies and two new floors of structural steel on the roof. |
|
 |
 |